St Brieuc, France Need A1 certificate
Must be EU national and previous experience in similar project
Required valid offshore certificates and Covid Vaccination
Contractor& 39;s scope of work for St. Brieuc project consists of:
• Load-out and transport of 190 pin piles.
• Transport of 62 WTG jackets.
• Installation of 190 pin piles. 186 for the WTG jackets and 4 for the OSS jacket.
• Installation of 62 WTG jackets.
For the positions we need surveyors with commitment including the summer period those are 4/4 rotations until October.
Crew change datums: 18/2, 18/3, 15/5,12/6,12/7,7/8, 7/9-31/9