jobholds
Commissioning Planner
المملكة المتحدة ,
•
تاريخ النشر: 2023-02-03
•
59 مشاهدة
تفاصيل ومتطلبات الوظيفة
My Client is a large international consultancy who specialise in Petrochemical and Chemical projects globally. Due to expansion, they are currently searching a Commissioning Planner to be based in Grangemouth,UK for a 12 month renewable contract. The Commissioning Planner will be based in the UK and then required to move to projects in Belgium after 12-18 months to support another project.<br /><br /> <br /><br /> The Commissioning Planner will be required to:<br /><br /> Have 10-15 years experience on Oil and gas projects<br /><br /> Have advanced Primavera experience<br /><br /> Review systems and lists and drawings<br /><br /> Develop Commissioning sequences<br /><br /> Review and prepare plans for pre commissioning, commissioning and start up<br /><br /> Produce monthly reports<br /><br /> Analyse critical paths and report on delays<br /><br /> Support claims management team<br /><br /> Investigate deviations from schedule and catch up planning<br /><br /> Prepare look ahead schedules<br /><br /> <br /><br /> If you feel you have the relevant experience, please feel free to apply. Commissioning experience is required<br /><br />To help Leap29 find you that perfect job, we need to store and process your personal information.<br />That means that your details will be entered into Leap29's database and our consultants may contact you from time to time with relevant job opportunities.<br />By applying you're confirming you're happy for us to do that!
وظائف مشابهة قد تهمك
Mechanical CAD Tolerance Analysis Digital Tools Engineer
المكسيك
عرض →
Internship: Lab Systems & Automation Intern, IT, 2026
إيطاليا
عرض →
Senior Director Translational Data Sciences
المملكة المتحدة
عرض →
Alternant(e) Technicien(ne) d’Intervention - BTS Electrotechnique - Villepinte - F/H
فرنسا
عرض →
Integrated Solutions Well Engineer
نيجيريا
عرض →
Senior Director-Molecule Steward Lead
الولايات المتحدة
عرض →
Analyste automation
كندا
عرض →
Mechanical Engineer
المملكة المتحدة
عرض →
Lead Engineer, Customer Order Engineering - Mechanical
الهند
عرض →
Senior Engineer, Product Design and Engineering - Mechanical
إيطاليا
عرض →
ملخص الوظيفة
المجال / التصنيف
هندسة
الدولة
المملكة المتحدة
المدينة
نوع الدوام
دوام كامل
إعلان وظيفة موثوق ومعتمد
تم التحقق من بيانات الإعلان لضمان تجربة تقديم آمنة ومباشرة للباحثين عن عمل.